National Repository of Grey Literature 2 records found  Search took 0.01 seconds. 
Warehouse Greenhouse Březhrad - construction technology project
Žitek, Jan ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The subject of this diploma thesis is the development of a construction and project for the construction of the building of the Greenhouse warehouse with administration in the village of Březhrad. The thesis includes a technical report for the construction and technology project, coordination of the traffic situation including the design of transport routes and a study of the implementation of the main technological stages. In addition, the calculation of the construction, the object time and financial plan and the time plan of the main construction object are addressed. The work also includes a list of works, supplies and services with a statement of quantities for the main construction object. In addition, the work deals with the design of the site facilities including the technical report and the design of the main machinery assemblies. A technological regulation for the implementation of the deep foundation of the building including a control test plan, a noise study and a specialised chapter dealing with the assessment of options for the implementation of retaining walls have also been prepared.
Production and administrative building in the village Drásov - construction technology project
Vaculík, Zdeněk ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The subject of my master's thesis is the realization of a prefabricated hall with an administrative annex in the village of Drásov. The production hall will serve as a winding and dispatch of production. The hall also includes a masonry annex, which will serve for administrative purposes and as social and hygienic facilities for employees. This thesis contains a technical report on the construction and technological project, a study of the implementation of the main technological stages of the SO 01 building and the solution of wider transport relations, including the drawing of traction curves for critical construction traffic. This work further examines the construction site equipment project, which is processed in four construction variants, including the overall location of the construction site in the area. A financial and time plan has been developed for the entire construction for all construction objects. The realization of the prefabricated hall was drawn in three drawing schemes, including material assurance of the prefabricates delivery. A detailed time plan and item budget was developed for the object. Within the work, a technological regulation was developed for the deep and surface foundations of the main object and also for the realization of the J01 pit. A control and testing plan, which was prepared for the realization of the deep foundation of the SO 01 object, follows the part of the technological specification. A safety and health protection plan, including possible risks, was also prepared for the foundation of the object. Last but not least, the phase of environmental protection during the construction works was also included. A noise study was prepared to examine the impact of construction noise on the surrounding buildings.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.